(1)2005年7月至2007年1月任南宁(坛洛)至百色高速公路NO.9合同段项目经理部机务员、材料员、兼职安全员。负责协助该项目设备副经理从事项目施工设备管理工作,并主要管理项目设备的维修保养,包括制定设备维修保养计划,备用物料采购计划,组织修理组进行维修保养,并负责管理项目设备备用物料,并负责项目设备安全管理工作,包括设备操作手的安全教育工作和危险源识别与管理。
(1) July 2005 to January 2007 - Operator, Material Control and part-time Security Officer, Project management department, Nanning (Tanluo) to Beise highway, resposible for assisting vice manager of project equipment to condut the management among contruction equipments of project. And conduct the repair and maintenance of the main project equipments, including the setup of repair and maintenance plan, procuremnt plan for spare materials, organization of repair team, and management of the spare materials. And also responsible for the security management of project equipment, including the security education of operators and the identificaiton and management of danger sources.
===
自我评价 :
Personal Characteristics
性格开朗,沟通能力较强,为人谦虚,善于学习,有较强的实际工作能力。
Open-minded, good in communication, moderate, good in learning and quality work experience.
勇于承担责任,有管理经验。
Responsible with management experience.
对工程机械十分熟悉和了解。善于诊断机械故障,特别是液压系统故障。
Knowing well on engineering machieries. Good at diagnose of merchanical failures, especially on hydraulic pressure system failures.
对工程机械和车用柴油机有较丰富的维修保养经验。
Plenty experiences of the repair on vehicle diesel engine and engineering machineries.
够了吗?